After a pipeline had been layed across a lake, a dispute arose concerning the actual pipe corridor used. Our AQC TotalSystem was used to conduct a survey along the pipeline, four separate areas were of particular concern. The key areas were surveyed and the results where overlaid on an existing AutoCAD drawing. The survey was conducted with the client and their engineering company as observers.